Download a Word-compatible .doc collection with a blank construction JHA/JSA form and 8 fictional training examples covering electrical, excavation, roofing, scaffolding and other high-risk construction work. Download a genuine PDF worksheet or use browser printing. Adapt every example to your actual task before use. Related: OSHA pre-task plan template, where to post evacuation maps.
Free account required. Enter your email once in the secure access gate.
Use the form for the actual task, not just the job title
The examples are fictional prompts, not approved work methods or a project-specific AHA. Break the real job into steps, identify interacting trades and changing conditions, assign controls to responsible people, and review them with the crew. Verify that controls are in place before work starts.
For example, construction electrical isolation is addressed by 1926.417. Trench protection under 1926.652 is not simply a rule for trenches deeper than five feet: the less-than-five-foot exception requires a competent-person examination finding no potential cave-in; stable rock is a separate exception.
Check the applicable construction program duties in 1926.20 and your project requirements. Word is editable; PDF is a printable worksheet. Neither format is an OSHA endorsement.
Preview the Free Construction JHA Template
Preview one of the 8 fictional training examples before signing in. Choose Word for editing, a US Letter PDF worksheet for printing, or browser printing. No format certifies the jobsite.
- ✓ Blank Construction JHA FormFill in job steps, hazards, controls, PPE, and sign-offs for your task.
- ✓ Word-Compatible DownloadDownload the .doc file and edit it in a compatible word processor.
- ✓ Print / Save as PDFUse your browser print dialog after account access; printable HTML is available if printing cannot open.
What's Included in the Free JHA Collection?
Get a blank form and eight fictional training examples after account access. Choose the Word collection or PDF download above, or use the separate browser-print action:
8 Construction JHA Examples
Fictional training examples for construction tasks. Expand an example for hazards, suggested controls and PPE prompts, then record the actual job steps and verified controls in the blank form. These are starting points, not site-specific approvals.
Electrical Construction JHA / JSA Example
- Electrical shock from energized equipment
- Arc-flash exposure
- Damaged cords and temporary power
- Falls from ladders
- Missed lockout/tagout
- Cuts from wire and conduit
View Electrical Rough-In & Temporary Power controls & PPE →
- De-energize and prevent re-energization; follow construction electrical requirements (1926.416 / 1926.417)
- Verify electrical conditions and task-specific protection with qualified personnel; PPE is not permission for energized work
- Inspect cords and required GFCI protection
- Set ladders on stable surfaces and use safe access practices
- Restrict electrical tasks to appropriately qualified and authorized workers
Excavation & Trenching JHA Example
- Cave-in / trench collapse
- Contact with underground utilities
- Heavy equipment traffic
- Spoil piles at trench edge
- Unsafe access and egress
- Hazardous atmosphere (gases)
View Excavation & Trenching controls & PPE →
- Provide cave-in protection under 1926.652; the exceptions are stable rock, or less than 5 ft with a competent-person examination finding no potential cave-in
- Locate utilities and coordinate with the utility owners before digging
- Keep spoil and equipment at least 2 ft from the edge or use effective retaining measures
- Provide safe egress within 25 ft of lateral travel in trenches 4 ft or deeper
- Have a competent person assess conditions; test for hazardous atmospheres where required
Roofing JHA / JSA Example
- Falls from roof edge and openings
- Falling objects to workers below
- Ladder setup and transitions
- Material handling on slopes
- Weather and heat illness
- Burns from hot materials
View Roofing Work controls & PPE →
- Select fall protection for the task, roof slope and applicable provisions of 1926.501 / 1926.502
- Protect roof openings with the appropriate compliant system
- Control falling-object hazards and access below
- Check access, footing and the selected protection system before work
- Assess heat conditions and provide appropriate water, rest and protective measures
Scaffolding & Work-at-Height JHA Example
- Falls from platforms
- Scaffold collapse or tip-over
- Poor platform conditions
- Unsafe access
- Falling tools and materials
- Overhead power lines
View Scaffolding & Work at Height controls & PPE →
- Select guardrails and/or personal fall arrest for the scaffold type and height under 1926.451(g)
- Competent person inspects before each work shift and after events affecting integrity
- Verify platform construction and permitted gaps under 1926.451(b)
- Provide safe access suited to the scaffold
- Control falling objects and the area below
- Verify power-line voltage and required clearances under 1926.451(f)(6)
Concrete Pouring JHA Example
- Chemical burns from wet concrete
- Struck-by concrete pump hose
- Heavy equipment movement
- Slips on wet surfaces
- Manual handling injuries
- Silica dust from cutting/grinding
View Concrete Pouring & Finishing controls & PPE →
- Alkali-resistant gloves, boots, and eye protection
- Exclusion zone around pump boom and hose whip area
- Spotters for equipment movement
- Rotate workers and use mechanical placement
- Wet cutting or vacuum shroud for silica control (1926.1153)
Steel Erection JHA Example
- Falls from height
- Suspended loads overhead
- Crane operations
- Pinch points during connection
- Structural stability during erection
- Welding burns and UV exposure
View Steel Erection controls & PPE →
- Steel erection above 15 ft generally requires fall protection; verify separate connector and controlled-decking-zone provisions under 1926.760
- Never stand under suspended loads
- Tag lines for load control and established drop zones
- Follow erection sequence for stability
- Welding PPE: auto-darkening hood, leather gloves, FR clothing
Demolition JHA Example
- Structural collapse
- Dust, silica, asbestos, and lead exposure
- Electrical hazards from live utilities
- Falling debris
- Hazardous materials
- Noise
View Demolition controls & PPE →
- Engineering survey by competent person before start (1926.850)
- Pre-demolition hazmat survey; abatement before demo
- Disconnect and cap all utilities
- Exclusion zones and debris chutes
- Dust suppression and respiratory protection per survey
Site Setup & Material Staging JHA Example
- Vehicle and equipment movement
- Struck-by falling materials
- Manual handling and overexertion
- Trips on uneven ground
- Poor storage and stacking
- Pedestrian interaction
View Site Setup & Material Staging controls & PPE →
- Plan traffic controls and trained signaling where needed
- Establish controlled material drop zones
- Assess load weight, shape, reach and frequency; use suitable lifting aids rather than a universal weight cutoff
- Clear and level staging areas
- Stack materials stable and secured
- Separate pedestrian walkways
The downloadable collection keeps every example plus the blank form in one place.
Electrical Construction JHA / JSA Template
Use this electrical construction JHA example to identify hazards associated with electrical installation, rough-in work, temporary power, energized equipment and related construction activities.
| Job Step | Hazard | Control | PPE |
|---|---|---|---|
| Inspect work area | Energized equipment | Identify circuits and hazards before work | Required task PPE |
| Install wiring | Shock / cuts | De-energize where required and inspect tools | Gloves / eye protection |
| Work at panel | Electrical exposure | Qualified personnel and appropriate controls | Task-specific PPE |
Download the Word-compatible Electrical JHA, or get all 8 examples and the blank form after free account access.
Blank Construction JHA Form
Need the empty form only? The blank construction JHA form includes every field a general contractor or safety manager expects to see.
Construction JHA Form Fields
How to Complete a Construction JHA
Six steps from blank form to a signed, posted JHA.
1. Break the Job Into Steps
2. Identify the Hazards
3. Choose Hazard Controls
4. Identify Required PPE
5. Review the JHA With the Crew
6. Document Employee Acknowledgement
JHA vs. JSA — What's the Difference?
Both terms describe the same pre-task hazard-identification process: break the job into steps, identify the hazards at each step, and document the controls. Whether your client asks for a construction JHA template or a construction JSA template, this template can support either process. Some organizations also use Task Hazard Analysis (THA) or Activity Hazard Analysis (AHA); confirm any required project-specific format.
Construction Hazards to Include in Your JHA
Work through this list for every task — OSHA's Fatal Four (falls, struck-by, electrocution, caught-in/between) cause the majority of construction deaths, but they're far from the only hazards worth documenting.
Falls
Electrical Hazards
Struck-By Hazards
Caught-In / Between
Excavation & Trenching
Heavy Equipment
Ladders & Scaffolds
Power Tools
Material Handling
Silica & Dust
Heat Stress
Chemicals
OSHA Construction JHA Guidance
OSHA does not publish a mandatory JHA form, but 29 CFR 1926.20(b) requires construction employers to initiate and maintain accident-prevention programs — which means evaluating workplace hazards before work begins. OSHA's own job hazard analysis guidance (OSHA Publication 3071) recommends exactly the process this template documents: break the job into steps, identify the hazards, and record the controls.
This construction JHA template is built on those OSHA hazard-analysis principles and cites the relevant standards (fall protection 1926.501, excavation 1926.652, scaffolds 1926.451, steel erection 1926.760, silica 1926.1153) in each example. It is a starting point for your own site-specific analysis — not an OSHA-approved or certified document, since OSHA does not approve or certify templates.
When Should a Construction JHA Be Updated?
A JHA should be reviewed when:
Don't treat your JHA as a one-time document.
Create a Site-Specific JHA
The template gives you a starting point. Your actual JHA should reflect the conditions, hazards, equipment and layout of the specific jobsite — walk the site with the crew, capture what the template missed, and re-issue it when anything changes.
Looking for other trades? Browse more JHA templates or all free safety templates.
Pair Your JHA With an Emergency Evacuation Map
Your JHA identifies the hazards. Your evacuation map shows workers where to go when something goes wrong. OSHA 29 CFR 1926.35 requires construction employers to have an emergency action plan covering evacuation routes and employee accounting.
Create Your Evacuation Map
See the safety plan from every angleWatch a sketch become a polished map, then step inside.Need to start from a rough layout?Sketch rooms and exits, then turn it into a clear safety map.Drag & drop your floor plan here
or
PNG, JPG, HEIC, TIFF, BMP, SVG, AVIF, WebP, PDF, DOC, DOCX, PPT, PPTX, XLS, XLSX, ODT, ODP, ODS, DXF, DWG - Hand-drawn sketches work too!
No floor plan handy? Try the included floor plan with real AI generation — no upload needed. This may take a minute or longer.
Move, resize, and recolor every exit sign, route, and icon.
Create a free account to save and download in HD. No credit card required.FREE
Frequently Asked Questions
Is this evacuation map generator really free?
Yes — you can generate your first OSHA-aligned evacuation map draft completely free. Just upload a floor plan and our AI drafts a professional map in about 30 seconds. No credit card required.
Are the generated maps aligned with OSHA?
Our AI drafts maps that follow OSHA 29 CFR 1910.36–37 and NFPA 101 Life Safety Code standards. Every map includes clearly marked exits, fire extinguisher locations, assembly points, and directional evacuation arrows. Supervisor review is required before posting to your facility.
What file formats can I upload?
We accept PNG, JPG, GIF, WebP, BMP, TIFF, AVIF, HEIC, SVG, PDF, DOC/DOCX, PPT/PPTX, XLS/XLSX, ODT, ODP, ODS, DXF, and DWG floor plans. Office and CAD files are converted securely before processing; PDF uploads let you choose the source page.
How long does map generation take?
Most maps are generated in 20–40 seconds. Complex multi-floor plans may take slightly longer. You see the preview instantly — create a free account (no credit card) to download the file.
Can I edit the map after generation?
Yes — every generated map opens in a free drag-and-drop editor where you can move, resize, and recolor exit signs, routes, and equipment icons. Enterprise features like multi-floor support and branded maps are available on paid plans.
Is my floor plan data secure?
Yes. All uploads are encrypted in transit (TLS 1.3) and processed in secure cloud environments. We do not share your floor plans with third parties.
Not on a construction site?
Request a free job-hazard review for a shop, warehouse, kitchen, store or office. Each industry page lists the jobs we review, the hazards to look for and a printable worksheet.
- Manufacturing Workplace Safety AssessmentProduction, setup, jam clearing, maintenance and shutdowns.
- Warehouse Workplace Safety AssessmentReceiving, forklifts, racking, picking, docks and battery charging.
- Auto Repair Workplace Safety AssessmentVehicle lifts, tires, batteries, solvents, exhaust and refinishing.
- Restaurant Workplace Safety AssessmentPrep, hot cooking, dishwashing, cold storage and closing shifts.
- Retail and Grocery Workplace Safety AssessmentDeliveries, stocking, box cutting, checkout and spill response.
- Office Workplace Safety AssessmentScreen work, storage, equipment, reception and office moves.
- Healthcare Workplace Safety AssessmentPatient handling, sharps, disinfection, equipment and shift work.
- Cleaning and Janitorial Workplace Safety AssessmentCleaning chemicals, wet floors, floor machines, waste and lone work.
- Hotel Workplace Safety AssessmentHousekeeping, laundry, kitchens, maintenance and guest contact.
Not sure what to look for first?Read the workplace hazard identification guide and checklist
Construction JHA Frequently Asked Questions
Download the Construction JHA Collection
8 fictional training examples + a blank form • Word and PDF downloads • Browser print / Save as PDF • Free account required
From guidance to a facility draft
Apply this guidance to a building-specific plan
Use the main maker for any building, or open a focused starting point with facility-specific review questions.
Open the Fire Escape Plan MakerFree OSHA Safety Tools & Industry Solutions
Trusted by 7,500+ facilities — explore compliance tools for every industry
Important Legal Disclaimer
The Occupational Safety and Health Administration (OSHA) does not approve, endorse, recommend, or certify any commercial products or software. This platform is a compliance assistance tool only and is not affiliated with or endorsed by OSHA or any government agency.
All AI-generated evacuation maps, safety plans, and compliance documents must be reviewed, verified, and approved by a qualified safety professional, fire marshal, licensed engineer, or appropriate authority before being posted, distributed, or used for emergency planning purposes.
Employers retain full legal responsibility for workplace safety under the Occupational Safety and Health Act of 1970 (OSH Act). Users are solely responsible for ensuring compliance with all applicable local, state, and federal regulations. This software does not guarantee OSHA compliance.
This software does not constitute legal, safety consulting, engineering, or professional advice. Content is for informational purposes only. Users should consult qualified safety professionals and legal counsel for compliance guidance specific to their operations.
While we strive for accuracy, workplace safety regulations change frequently. We make no warranties regarding the accuracy, completeness, or current validity of any information. Users must independently verify all regulatory requirements applicable to their specific circumstances.
To the maximum extent permitted by law, OSHAMap, its owners, operators, affiliates, and licensors shall not be liable for any direct, indirect, incidental, special, consequential, or punitive damages arising from use of this service, including but not limited to workplace injuries, OSHA violations, regulatory fines, property damage, or any other losses.
Cost comparisons and savings estimates are based on industry averages for professional safety consultant fees and are provided for informational purposes only. Actual costs, savings, and results may vary significantly based on your specific situation.
By using OSHAMap, you acknowledge that you have read, understood, and agree to be bound by these terms. For complete terms, see our Terms of Service and Privacy Policy.
OSHAMap is not endorsed by OSHA. Review this checklist with a qualified safety professional and verify all requirements that apply to your workplace before use.